Archives |
Back to Blog
Matagarup Bridge Project1/7/2019 Adwest Group were extremely honored in supplying the balustrading and metal cladding for the iconic Matagaraup Bridge linking East Perth to the Optus Stadium. This project involved the fabrication of over 400 balustrade panels and over 2000 cladding panels. On average, each balustrading panel weighed 200Kg, resulting in a total of approximately 80 Tonnes of steelwork. Each panel was slightly different with subtle horizontal and vertical curves to match the shape of the bridge deck. This was a very high-profile project and one that Adwest Group was very proud to be associated with.
0 Comments
Read More
|